₹2.23 L
Leakage caught, one tower
Committed against certified, read live — so the gap surfaces while it can still be argued, not at month end when it is already spent.
Get complete visibility across costs, materials, procurement, teams, schedules, and site progress. Catch issues early, reduce waste, and keep every project moving profitably from planning to completion.
Eight steps, one record — nothing re-entered
Trusted by
Every one of these does a slice of a construction project well — and hands the next slice to a spreadsheet. That handover is where the estimate, the order and the site stop agreeing.

One record underneath all of it. The estimate the tender goes out on is the estimate the WBS is built from, and the order, the receipt and the site log close against it — nothing exported, nothing re-keyed.
Below is a single line of a real bill of quantities, and the seven jobs that read it. Not seven copies that agree until somebody edits one — the same row, opened seven ways, by everybody who is answerable for a number on it.
B-204 RCC M30 in slabs
Skyline Towers · Tower A · Level 04
Anybody can show you a bill of quantities. This is the chain behind one cell of it — masters, rate analysis, the BOQ rate, the planning pipeline, the WBS the bill generates, and the dashboard it all rolls up to. It plays on its own, or press Next.
01 · Masters
Management/Master Resources
Search · ⌘KAdd material| Code | Material | Category | Unit | Base rate ₹ | Chennai rate ₹ |
|---|---|---|---|---|---|
| MAT-014 | Cement OPC 53 | Cement | bag | 412.00 | 428.48 |
| MAT-021 | M-Sand, washed | Aggregates | cum | 1,150.00 | 1,196.00 |
| MAT-033 | Aggregate 20mm | Aggregates | cum | 1,320.00 | 1,372.80override |
| MAT-041 | TMT Fe500D | Steel | kg | 69.90 | 72.70 |
| MAT-052 | Shuttering ply 12mm | Formwork | sqm | 1,980.00 | 2,059.20 |
| MAT-067 | Binding wire | Steel | kg | 74.00 | 76.96 |
| MAT-078 | Admixture, plasticiser | Chemicals | ltr | 148.00 | 153.92override |
| MAT-086 | Curing compound | Chemicals | ltr | 212.00 | 220.48 |
| MAT-094 | Cover blocks 25mm | Steel | nos | 3.40 | 3.54 |
| MAT-101 | Tie rods, formwork | Formwork | nos | 86.00 | 89.44 |
Materials
112
Equipment
34
Labour
28
Other costs
9
Contractors
31
Vendors
34
01 / 08|Six masters behind one tab bar
Compared by category rather than by brand, because every product below ships continuously and a tick published today is wrong by the spring. Find your own stack in a column and read the last row.
ArizeFlow | PM & field suites Procore, Autodesk Build | Estimating tools CostX, Candy | Scheduling tools Primavera, MS Project | ERP & spreadsheets SAP, Tally, Excel | |
|---|---|---|---|---|---|
| Master rate library, priced per location | Yes | Not what the tool is for | Partly, or through an integration | Not what the tool is for | Partly, or through an integration |
| Rate analysis — a recipe, assembled into a rate | Yes | Not what the tool is for | Yes | Not what the tool is for | Not what the tool is for |
| BOQ priced from that library, not typed | Yes | Partly, or through an integration | Yes | Not what the tool is for | Partly, or through an integration |
| Tender against the very same BOQ | Yes | Partly, or through an integration | Partly, or through an integration | Not what the tool is for | Not what the tool is for |
| WBS generated from the confirmed BOQ | Yes | Not what the tool is for | Not what the tool is for | Not what the tool is for | Not what the tool is for |
| Programme carrying the BOQ's quantities | Yes | Partly, or through an integration | Not what the tool is for | Partly, or through an integration | Not what the tool is for |
| Purchase order raised from a scheduled activity | Yes | Partly, or through an integration | Not what the tool is for | Not what the tool is for | Partly, or through an integration |
| Store receipt closing against a BOQ line | Yes | Partly, or through an integration | Not what the tool is for | Not what the tool is for | Partly, or through an integration |
| Site execution, offline-first, from a phone | Yes | Yes | Not what the tool is for | Not what the tool is for | Not what the tool is for |
| All of the above on one record, with no re-keying | Yes | Not what the tool is for | Not what the tool is for | Not what the tool is for | Not what the tool is for |
| Rows it does outright | 10 / 10 | 1 / 10 | 2 / 10 | 0 / 10 | 0 / 10 |
Named products are examples of each category, not a statement about any one of them. Dedicated estimating tools do rate build-ups properly — the difference is not that ArizeFlow prices a BOQ, it is that the same BOQ then generates the WBS, sizes the orders and closes against the store, without being re-entered anywhere.
The last row
Bring one live project. In forty-five minutes we will price it from your own rate library, send it out to tender, generate the WBS from the same bill and raise an order against a scheduled activity — on your data, in front of you.
Book a demoFourteen phases from Site Preparation to Handover, over the four numbers a planner opens it for. Drag a bar and everything downstream of it moves.
Skyline Towers — Tower A
Chennai · 6 floors · RCC frame
Duration
412 days
22 May 23 → 30 Dec 25
Float on critical path
0 days
Slab L4 → Walls L4
Activities behind
60
of 412 planned
Earned value
72.34%
against 78% planned
ArizeFlow began on a job where the estimate, the programme and the store had stopped agreeing — and the argument was costing more than the concrete. We built the thing that made them agree, and we still build it beside the people using it.
From estimators, project directors and the people who actually run the store.
We used to close the month by arguing about which number was right. Now the argument is gone, because the estimate and the store are reading the same row.
Chief Estimator
Residential developer · Chennai
The measurement sheet is what changed my team. Every quantity can be opened up and explained, so a client dispute lasts ten minutes instead of a fortnight.
Head of Projects
Apartment developer · Chennai
Tendering used to mean emailing a spreadsheet and hoping. Contractors now price a scope that cannot move underneath them, and we compare every bid against our own number automatically.
Procurement Director
Infrastructure contractor · India
Every figure below is worked from Skyline Towers — the example project that runs through this whole site — so you can follow how each one is arrived at instead of taking it on trust. They are not a customer's audited results, and we do not present them as any.
₹2.23 L
Leakage caught, one tower
Committed against certified, read live — so the gap surfaces while it can still be argued, not at month end when it is already spent.
6 days → 4 hours
Monthly close
The position is read from the record instead of rebuilt from four sources. Five and a half days a month back, every month.
1 measurement
Priced, ordered, received, used
Taken once off the drawing and reused by every module downstream. Nothing is re-keyed, so nothing can quietly disagree.
< 1 project
To pay for itself
On the numbers above, the licence is recovered inside a single tower — the rest of the portfolio is margin the leak was taking.
Demonstration figures from the worked example, not a customer’s accounts. We will run the same measurement on your own project during the demo.
Every plan carries unlimited users across all fifteen roles. What changes is how much of the business runs through it.
One company, a handful of live projects.
Several concurrent projects and a full back office.
Large portfolios, or whatever your auditors require.
Figures are quoted after a working session, because a company running four projects and one running forty are not the same problem — and a price list that pretends otherwise is a price list somebody has to argue with later.
Start with one project. We set it up with your BOQ, and you keep the data either way.
If yours is not here, ask it directly — the answer will be as specific as these are.
No. Bring the sheets you already price with and we import them zone by zone — items, measurement rows and rates. Most companies run their next tender in ArizeFlow alongside the spreadsheet, compare the two totals, and only stop maintaining the spreadsheet once they agree.
Start your flow
A working session with your BOQ, your programme and your vendors. Not a slide deck.
What happens next
You send this
Name, company and roughly how many live projects you are running. Nothing you would have to look up.
We reply within a working day
Usually sooner, and from a person rather than a sequence. We will ask what you would want to see first.
45 minutes, on your data
Bring a BOQ you have already priced. We rebuild it zone by zone in front of you and show you where the two totals disagree.
A recommendation, then your decision
What we would run first, what it would take to get there, and what it costs for your project count. No obligation attached to any of it.