Site Execution

Recorded wherethe work is, not ina Monday report.

The site already knows what happened today. The problem has always been the distance between knowing it and it being in the system — so the system goes to the site.

Daily progress · Skyline Towers · today
Slabs — Floors 1-672%

+4% today

Block masonry 1-435%

+2% today

Labour on site

Mason18
Helper26
Bar bender9

Safety round

18/18

All measures cleared

IMG

Slab reinforcement — grid C4

12.9698°N, 80.2437°E · 11:42 · stamped on capture

01What the site records

Four things, entered by the person who saw them.

Not a form designed in an office. Each of these is something an engineer already writes down somewhere — usually in a book nobody else can read.

Progress against the activity

Not a percentage invented for a report — progress against the scheduled work package, which is what moves the programme.

Labour and plant on the ground

Who was actually there and what was running, so a duration that slipped has a reason attached.

Quality and safety rounds

Checklists your company owns. Add a measure because your site needs it, not because a vendor shipped it.

Photographs as evidence

Stamped with where and when at the moment of capture, so a picture of a slab can still be tied to that slab a year later.

02The field app

Designed for one hand, in direct sun.

Deliberately not theme-aware. A phone left on automatic dark mode turns a store screen charcoal at exactly the hour the light gets bad, and a storekeeper reading a quantity in a yard at 5pm is the case this app exists for. White stays legible in sunlight; dark grey does not.

Body text is 16px

A size larger than a typical app, because the alternative is holding the phone closer with hands that are not clean.

52px minimum tap target

The height of anything a gloved thumb has to hit.

Camera-only for site photos

Progress photographs must be taken live, so the gallery is not an option.

The store has its own role

Receiving and issuing belong to the storekeeper, not to the engineer pouring concrete.

9:41Site · Skyline

Receive material

PO-0042 · 180 cum RMC

Issue to activity

Slabs — Floors 1-6

Daily progress

2 activities open

Site photo

Camera only

On hand

638 bag

Put it in a site engineer's hands.

The fastest way to judge this is to give the app to somebody who is actually on site tomorrow.

Build smarter.Execute faster.Deliver better.