Planning & Schedule
Planning is a sequence of dependent decisions, not a folder of documents. Each stage has to be answered before the next opens, and the whole thing locks when it is signed off.
Every stage knows what the last one decided.
Skipping is allowed. Skipping silently is not — a skipped stage records who decided and why.
Project setup
Client, district, areas, programme dates and the project manager. The district becomes the pricing context for everything downstream.
Statutory approvals
Land title, planning permission, utility NOCs. Sits before design, because it decides whether there is a project at all.
Design & engineering
The drawing register, with architects uploading through their own link and revisions superseding cleanly.
BOQ & cost planning
Zone-first measurement priced by rate analysis. This is the number the whole programme is built against.
Resource requirement
What the priced BOQ implies in material, labour and plant, consolidated across every line.
Tender
Out to contractors on an expiring link, with the scope frozen at the moment of invite.
WBS
Work packages generated from the priced lines, nested to any depth, each with an owner.
Resource planning
The engineers who monitor each activity and the vendors who supply it.
Detailed scheduling
Durations from quantity and output, dependencies with lag, calendars, and a computed critical path.
The gate
Ready to Build
Planning locks, the baseline is captured with who threw the switch and when, and rates freeze — so every variance afterwards is measured against a plan somebody actually signed.
The critical path is computed, not coloured in.
Durations come from quantity divided by the crew's output. Change one and the path moves.
Four dependency types
FS, SS, FF and SF, each with lag — because a slab does not always wait for a whole floor to finish.
A working calendar
Six-day weeks, declared holidays and a monsoon window, so a date is a date somebody can actually work.
Baselines
Captured at lock. Variance is measured against them rather than against last week's optimism.
We will rebuild it from the priced BOQ and show you where the durations came from.